Projects

Completed Projects

Hotel Amaris Apsari Surabaya

  • Bored Piling

  • Retaining Wall

  • Plunge-in Column

Wisma AtletKemayoran (Blok D10 Tower 3)

  • Bored Piling

Pasar Rumput Low Cost Apartment

  • Bored Piling

  • Retaining Wall

Bakaheuni-TerbanggiBesar Toll Road (Package 1: Bakaheuni-Sidomulyo)

  • Bored Piling

Ciawi-Sukabumi Toll Road (Section 1)

  • Bored Piling

  • Retaining Wall

  • Others

Cisumdawu Toll Road (Phase 2)

  • Bored Piling

  • Driven Piling

Semarang - Solo Toll Road (Salatiga-Kertasura Package)

  • Bored Piling

Sarulla Geothermal

  • Conductor Pipes Installation

Infinity Building 2

  • Bored Piling

  • Retaining Wall

DAPENBI OfficeBuilding

  • Bored Piling

Minangkabau International Airport Terminal Building

  • Bored Piling

Pasar Jumat Low Cost Apartment

  • Bored Piling

Depati Amir Airport Terminal Building Extension

  • Driven Piling

Ciawi - Sukabumi Toll Road (Section 2)

  • Bored Piling

MM2100 Underpass

  • Retaining Wall

Istiqlal Mosque Renovation

  • Bored Piling

  • Retaining Wall

TTL Residences Project (North Tower)

  • Bored Piling

Tanjung Barat Flyover

  • Bored Piling

Purbaleunyi Toll Road - On Ramp Jatiluhur Slope Strengthening

  • Bored Piling