FINISHED PROJECTS
UOB CHUBB Square Entrance & MRT Tunnel Connection
26 Panels, 600 mm thick and 12-15 mtr deep diaphragm wall for soil retention
Pembangunan Boiler Indorama Area IPCI
193 nos Dia.600 mm, 23-25 mtr deep bored piles for boiler foundation
Pembangunan Boiler Indorama Area IRS
251 nos Dia.600 mm, 9-13 mtr deep bored piles for boiler foundation
Jembatan Collector ROW 15 Kota Baru Parahyangan
59 nos Dia.1000 mm, 11-26 mtr deep bored piles for bridge foundation
Rest Area Toll Cisumdawu Tahap 1 & 2
29 nos Dia.800 mm & 30 nos , 23-25 mtr Dia.1200 mm, 17-30 mtr deep bored piles and soldier piles for retaining wall and bridge foundation
Rest Area Toll Cisumdawu Tahap 3
89 nos Dia.800 mm, 12-17 mtr deep soldier piles for retaining wall
Penanganan Longsor Tol Cisumawu Km 197+800
29 nos Dia.800 mm, 13-15 mtr deep soldier piles for retaining wall and landslide remedation
Toll Patimban Paket 3
24 nos Dia.1000 mm, 26-27 mtr deep bored piles for toll road structure
Hotel Amaris Apsari
124 nos of 800-1000 mm Diameter 38 m Deep Bored Piles and 374 nos 600 mm Diameter 17-20 m Deep Secant Pile Wall
Superblok K2 Park
1440 nos of 1000 mm Diameter and 11 m Deep Bored Piles and 670 m Perimeter Secant Pile Wall
Hotel Arthama
57 nos of 1000 mm Diameter and 40 m Deep Bored Piles
Ciawi Sukabumi Toll Road Section 1 (Cisadane Rv. Bridge)
16 nos of 1200 mm Diameter and 30 m Deep Bored Piles
Ciawi Sukabumi Toll Road Section 1 (Cigintung Rv. Bridge)
48 nos of 1200 mm Diameter and 15-22 m Deep Bored Piles
Wisma Atlet Blok D10-2 Tower 3
281 nos of 1000 mm Diameter and 30 m Deep Bored Pile
Trans Sumatera Toll Road (Section Bakaheuni – Sidomulyo)
500 nos 800 mm Diameter and 10-25 m Deep Bored Piles
Semarang – Solo Toll Road
Section Salatiga- Kertasura (Kali Cemoro Rv. Bridge)
70 nos of 1500 mm Diameter and 9-22 m Deep Bored Piles
Rusun Tingkat Tinggi Pasar Rumput
369 nos 1000 mm dia. 20 m deep bored pile, 930 nos 600 mm dia. 18 m deep soldier pile
Ciawi - Sukabumi Toll Road Section 1
Cigombong Extension
298 nos of 1200 mm Diameter and 14 - 38 m Deep Bored Piles
Cisumdawu Toll Road Phase 2
200 nos 800 & 1000 mm dia. 18 - 27 m deep bored pile
Hotel R1
89 nos of 800 mm dia. 24 m deep bored pile
Ciawi – Sukabumi Toll Road Section 1
Cigombong 1 Slope Protection.
150 nos 800 mm dia. 22 m deep secant pile wall
Infinity Building 2
152 nos 800 mm dia. 25 m deep bored pile, 284 nos 600, 800 & 1000 mm dia. 17 m deep soldier pile
Renovasi Masjid Istiqlal
1500 nos 800 mm dia., 20 - 25 m deep bored piles & secant piles
Gedung DAPENBI
93 nos 800 mm dia. 35 m deep bored pile
Gedung Terminal Bandara Internasional Minangkabau
609 nos 600 mm & 800 mm dia., 6 - 10 m deep bored piles
Corrugatenstallation
1. CCSP installation at Ciawi- Sukabumi Toll Road (Cigombong Extension)
2. CCSP installation at Depok – Antasari Toll Road (Simpang Susun Antasari)
3. CCSP Installation at Depok – Antasari Toll Road (Haji Tairin)
Corrugated Concrete Sheet Pile (CCSP) Installation
1. CCSP installation at Ciawi- Sukabumi Toll Road (Cigombong Extension)
2. CCSP installation at Depok – Antasari Toll Road (Simpang Susun Antasari)
3. CCSP Installation at Depok – Antasari Toll Road (Haji Tairin)
Japek II, Setu, Bekasi
Diameter
: 300 mm
Total Depth
: 5 m
Work Desc
: Bored Pile
Serang-Panimbang Main Toll Road Project Package 1
Bocimi Section 3A Project (Campedak Bridge)
Hydrogen Peroxide Plant Project
Riung Tower Construction Project in Bekasi
Riverie Bridge Project at Shilla Sawangan
Club House Project
Cibubur Youth Sport Center
491 nos Dia. 600 deep bored pile for building foundation
PAM JAYA Service Center Building
210 nos Dia. 800 and 48 nos Dia.450, 23 - 30 mtr deep bored pile and soldier pile for building foundation
Patimban Toll Road Package 3
24 nos Dia. 1000, 23 mtr deep bored pile for toll road foundation
Cisumdawu Toll Road KM 207
99 nos Dia. 1200, 24 - 27 mtr deep bored pile for soil stablization